Ihsan Kamil

Singapore Salary Survey / Guide 2011/2012

Click here to download:
sg_salary_guide_2011.pdf (1.48 MB)
(download)

Join us for earning cash from online / internet and simply by sending emails...from google adsense

----------------------------------------------------------

Singapore Salary Guide 2011/2012
Singapore Salary Survey 2011/2012
Singapore Salary Update 2011/2012
 
---------------------------------------------------------
 
 

Singapore Salary Guide 2011/2012

Click here to download:
sg_salary_guide_2011.pdf (1.48 MB)
(download)

Singapore Salary Guide 2011/2012
Singapore Salary Survey 2011/2012
Singapore Salary Update 2011/2012
 
---------------------------------------------------------
 

PSAK Terupdate September 2011 (IFRS Konvergensi)

SAK UPDATE PER SEPTEMBER 2011

PSAK, ISAK dan PPSAK yang masih efektif berlaku

No -PSAK/ISAK/PPSAK -Tanggal Efektif

1 PSAK 1 (2009) Penyajian Laporan Keuangan 1-Jan-11

2 PSAK 2 (2009) Laporan Arus Kas 1-Jan-11

3 PSAK 3 (2010) Laporan Keuangan Interim 1-Jan-11

4 PSAK 4 (2009) Laporan Keuangan Konsolidasian dan Laporan Keuangan
Tersendiri 1-Jan-11

5 PSAK 5 (2009) Segmen Operasi 1-Jan-11

6 PSAK 7 (2010) Pengungkapan Pihak-pihak Berelasi 1-Jan-11

7 PSAK 8 (2010) Peristiwa setelah Periode Pelaporan 1-Jan-11

8 PSAK 10 (2009) Pengaruh Perubahan Kurs Valuta Asing 1-Jan-12

9 PSAK 12 (2009) Bagian Partisipasi dalam Ventura Bersama 1-Jan-11

10 PSAK 13 (2007) Properti Investasi 1-Jan-08

11 PSAK 14 (2008) Persediaan 1-Jan-09

12 PSAK 15 (2009) Investasi pada Entitas Asosiasi 1-Jan-11

13 PSAK 16 (2007) Aset Tetap 1-Jan-08

14 PSAK 18 (2010) Akuntansi dan Pelaporan Program Manfaat Purnakarya 1-Jan-12

15 PSAK 19 (2010) Aset Takberwujud 1-Jan-11

16 PSAK 22 (2010) Kombinasi Bisnis 1-Jan-11

17 PSAK 23 (2010) Pendapatan 1-Jan-11

18 PSAK 24 (2010) Imbalan Kerja 1-Jan-12

19 PSAK 25 (2009) Kebijakan Akuntansi, Perubahan Estimasi Akuntansi,
dan Kesalahan 1-Jan-11

20 PSAK 26 (2008) Biaya Pinjaman 1-Jan-10

21 PSAK 28 ( 2010) Akuntansi Kontrak Asuransi Kerugian 1-Jan-12

22 PSAK 30 (2007) Sewa 1-Jan-08

23 PSAK 33 (2010) Aktivitas Pengupasan Lapisan Tanah Dan Pengelolaan
Lingkungan Hidup Pada Pertambangan Umum 1-Jan-12

24 PSAK 34 (2010) Kontrak Konstruksi 1-Jan-12

25 PSAK 38 (2004) Akuntansi Restrukturisasi Entitas Sepengendali 1-Jan-05

26 PSAK 36 (2010) Akuntansi Kontrak Asuransi Jiwa 1-Jan-12

27 PSAK 45 (2010) Pelaporan Keuangan Organisasi Nirlaba 1-Jan-12

28 PSAK 46 (2010) Pajak Penghasilan 1-Jan-12

29 PSAK 48 (2009) Penurunan Nilai Aset 1-Jan-11

30 PSAK 50 (2010) Insurumen Keuangan: Penyajian 1-Jan-12

31 PSAK 53 (2010) Pembayaran Berbasis Saham 1-Jan-12

32 PSAK 55 (2006) Instrumen Keuangan: Pengakuan dan Pengukuran 1-Jan-10

33 PSAK 56 (2010) Laba Per Saham 1-Jan-12

34 PSAK 57 (2009) Provisi, Liabilitas Kontinjensi, dan Aset Kontinjensi 1-Jan-11

35 PSAK 58 (2009) Aset Tidak Lancar yang Dimiliki untuk Dijual dan
Operasi yang Dihentikan 1-Jan-11

36 PSAK 60 Instrumen Keuangan: Pengungkapan 1-Jan-12

37 PSAK 61 Akuntansi Hibah Pemerintah dan pengungkapan bantuan
pemerintah 1-Jan-12

38 PSAK 62 Kontrak Asuransi 1-Jan-12

39 PSAK 63 Pelaporan Keuangan dalam Ekonomi Hiperinflasi 1-Jan-12

40 PSAK 64 Aktivitas Eksplorasi dan Evaluasi Pada Pertambangan Sumber
Daya Mineral 1-Jan-12

41 ISAK 7 (2009) Konsolidasi Entitas Bertujuan Khusus 1-Jan-11

42 ISAK 8 Penentuan Apakah Suatu Perjanjian Mengandung Suatu Sewa dan
Pembahasan Lebih Lanjut Ketentuan Transisi PSAK 30 (Revisi 2007)
1-Jan-08

43 ISAK 9 Perubahan atas Liabilitas Aktivitas Purnaoperasi, Restorasi,
dan Liabilitas Serupa 1-Jan-11

44 ISAK 10 Program Loyalitas Pelanggan 1-Jan-11

45 ISAK 11 Distrubusi Aset Nonkas kepada Pemilik 1-Jan-11

46 ISAK 12 Pengendalian Bersama Entitas : Kontribusi Nonmoneter oleh
Venturer 1-Jan-11

47 ISAK 13 Lindung Nilai Investasi Neto dalam Kegiatan Usaha Luar
Negeri. 1-Jan-12

48 ISAK 14 Aset Takberwujud - Biaya Situs Web 1-Jan-11

49 ISAK 15 PSAK 24-Batas Aset Imbalan Pasti, Persyaratan Pendanaan
Minimum dan Interaksinya 1-Jan-12

50 ISAK 16 Perjanjian Konsesi Jasa 1-Jan-12

51 ISAK 17 Laporan Keuangan Interim dan Penurunan Nilai 1-Jan-11

52 ISAK 18 Bantuan Pemerintah – Tidak Berelasi Spesifik dengan
Aktivitas Operasi 1-Jan-12

53 ISAK 19 Penerapan Pendekatan Penyajian Kembali dalam PSAK 63:
Pelaporan Keuangan dalam Ekonomi Hiperinflasi 1-Jan-12

54 ISAK 20 Pajak penghasilan - perubahan dalam status pajak entitas
atau para pemegang saham 1-Jan-12

55 ISAK 21 Perjanjian Konstruksi Real Estat 1-Jan-13

56 ISAK 22 Perjanjian Konsesi Jasa: Pengungkapan 1-Jan-12

57 ISAK 23 Sewa Operasi - Insentif 1-Jan-12

58 ISAK 24 Evaluasi Substansi beberapa transaksi yang melibatkan suatu
bentuk legal sewa 1-Jan-12

59 PPSAK 1 Pencabutan PSAK 32: Akuntansi Pengusahaan Hutan, PSAK 35:
Akuntansi Pendapatan Jasa Telekomunikasi, dan

SAK 37: Akuntansi Penyelenggaraan jalan Tol 1-Jan-10

60 PPSAK 2 Pencabutan PSAK 41: Akuntansi Waran dan PSAK 43 Akuntansi
Anjak Piutang 1-Jan-10

61 PPSAK 3 Pencabutan PSAK 54: Akuntansi Rekstrukturisasi Utang
Piutang Bermasalah 1-Jan-10

62 PPSAK 4 Pencabutan PSAK 31:Akuntansi Perbankan, PSAK 42: Akuntansi
Perusahaan Efek, dan PSAK 49: Akuntansi Perusahaan Reksa Dana 1-Jan-10

63 PPSAK 5 Pencabutan ISAK 06 : Interpretasi atas paragraf 12 dan 16
PSAK 55 (1999) tentang Instrumen Derivatif Melekat pada Kntrak Dalam
Mata Uang Asing 1-Jan-10

64 PPSAK 6 Pencabutan PSAK 21: Akuntansi Ekuitas, ISAK 1: Interpretasi
atas Paragraf 23 PSAK No. 21 tentang Penentuan Harga Pasar Dividen
Saham; ISAK 2 Interpretasi atas Penyajian Piutang pada Pemesan Saham
dan ISAK 3 Interpretasi tentang Perlakuan kuntansi atas Pemberian
Sumbangan atau Bantuan.Sejak disahkan penerapan dini diperbolehkan

65 PPSAK 8 Pencabutan PSAK 27: Akuntansi Perkoperasian 1-Jan-12

66 PPSAK 10 Pencabutan PSAK 51: Akuntansi kuasi reorganisasi 1-Jan-12

67 PPSAK 11 pencabutan PSAK 39 Akuntansi Kerja Sama Operas 1-Jan-12


SAK SYARIAH yang masih efektif berlaku

No PSAK Tanggal Efektif

68 PSAK 59Akuntansi Perbankan Syariah
1-Jan-03

69 PSAK 101 Penyajian Laporan Keuangan Syariah 1-Jan-08

70 PSAK 102 Akuntansi Murabahah 1-Jan-08

71 PSAK 103 Akuntansi Salam 1-Jan-08

72 PSAK 104 Akuntansi Istishna’ 1-Jan-08

73 PSAK 105 Akuntansi Mudharabah 1-Jan-08

74 PSAK 106 Akuntansi Musyarakah 1-Jan-08

75 PSAK 107 Akuntansi Ijarah 1-Jan-10

76 PSAK 108 Akuntansi Transaksi Asuransi Syariah 1-Jan-10

77 PSAK 109 Akuntansi Zakat dan Infak/Sedekah 1-Jan-12

TIPS & TRIK : Cara Tepat Minta Naik Gaji

Oleh Amelia Ayu Kinanti | Yahoo! She – Jum, 7 Okt 2011 10.51 WIB

Jika Anda merasa perusahaaan tempat Anda bekerja belum memberikan
apresiasi yang cukup terhadap kinerja, meminta kenaikan gaji bukanlah
hal yang salah. Namun ada sopan santunnya. Agar tak salah melangkah,
coba ikuti kiat-kiat berikut.

Mencari tahu peraturan perusahaan
Yang paling penting dilakukan pertama kali adalah mencari tahu
peraturan perusahaan. Kapan waktu perusahaan menaikkan gaji karyawan?
Parameter apa yang digunakan untuk menaikkan gaji karyawan?

Membandingkan gaji
Setelah mengenal peraturan perusahaan, yang harus Anda lakukan adalah
melakukan perbandingan gaji dengan orang lain yang memiliki tanggung
jawab serta jabatan yang sama dengan Anda dari perusahaan lain. Dengan
ini, Anda dapat menemukan rentang gaji yang tepat untuk kemudian
diajukan kepada atasan.

Daftar keberhasilan
Anda harus memiliki alasan yang kuat saat meminta kenaikan gaji. Untuk
itu, susunlah daftar keberhasilan dan pencapaian Anda dalam kerja.
Rangkumlah hal tersebut dalam sebuah dokumentasi yang rapi, jelas
serta menarik. Sehingga atasan juga mengetahui alasan jelas untuk
menaikkan gaji Anda.

Atur pertemuan
Setelah semua persiapan matang, aturlah jadwal pertemuan dengan
atasan. Cari waktu yang tepat. Jangan sampai Anda mengatur jadwal saat
pekerjaan tengah banyak, atau perusahaan diguncang masalah. Meminta
gaji di saat suasana hati atasan buruk hanya akan membuat Anda
tertimpa masalah.

Langsung pada pokok masalah
Saat pertemuan, utarakan maksud Anda dengan jelas, jangan bertele-tele
karena malah bisa menimbulkan makna yang bias. Komunikasikan secara
profesional namun santai. Jangan lupa juga untuk menyebutkan nominal
jelas kenaikan gaji yang Anda minta. Hal ini dapat berupa persentase
ataupun jumlah dalam rupiah.

Jangan mengancam
Meminta kenaikan gaji tak perlu dengan cara mengintimidasi. Misalnya
menyombongkan diri bahwa Anda mampu diterima di perusahaan lain dengan
gaji yang lebih besar. Ini malah hanya membuat Anda terlihat buruk di
hadapan atasan.

Bagaimana? Siap menggapai kesempatan?
Apakah anda memiliki tips & trik yang lain? ;)

Beasiswa PhD Dikti-Neso Jalur Khusus di Belanda

Bagi para dosen tetap baik dari perguruan tinggi swasta (PTS) dan
perguruan tinggi negeri (PTN), bisa mencoba peluang beasiswa yang
diselenggarakan Direktorat Pendidik dan Tenaga Kependidikan DIKTI
untuk mengikuti program doktor di Belanda. Beasiswa diberikan kepada
calon yang berstatus mahasiswa baru selama maksimum 36 bulan atau 3
tahun. Sementara, untuk tahun keempat akan dibiayai oleh universitas
di Belanda.

Persyaratan

Persyaratan yang harus dipenuhi oleh pelamar BLN Jalur Khusus:
* Dosen tetap dari PTN atau PTS;
* Telah mendapatkan unconditional Letter of Acceptance yang masih
berlaku dari Perguruan Tinggi luar negeri yang dituju (diutamakan yang
berasal dari perguruan tinggi dengan reputasi baik berdasarkan ranking
THES dan Webos);
* Telah mempunyai gelar S2 atau yang setara;
* Penguasaan bahasa Inggris yang memadai (IBT TOEFL minimal 80, atau
IELTS minimal 6.0), dan atau bahasa pengantar lain yang digunakan di
perguruan tinggi tujuan masing-masing;
* Telah mempunyai usulan penelitian yang disetujui oleh (sekurang-
kurangnya sudah dikomunikasikan dengan) calon pembimbing di PT luar
negeri yang dituju;
* Umur calon tidak lebih dari 50 tahun ketika mendaftar;
* Pelamar yang berstatus suami dan istri dari bidang keilmuan yang
sama, di tidak diperkenankan melamar pada perguruan tinggi yang sama
dan/atau dibimbing oleh promotor yang sama.

Prosedur Pendaftaran

1. Pelamar mendaftar secara online di www.beasiswa.diki.go.id, setelah
itu pelamar akan mendapatkan nomor registrasi;
2. Pelamar mengunduh Formulir A Khusus (beasiswa Dikti-Neso) dari
website, kemudian mengisinya;
3. Pelamar mengirim berkas-berkas ke Dikti berupa: * Formulir A Khusus
(beasiswa Dikti-Neso) yang sudah diisi;
* Surat izin/persetujuan dari Rektor/Pimpinan universitas tempat
pelamar bekerja;
* Surat rekomendasi dari professor lokal (Indonesia);
* Surat persetujuan dari Kopertis, hanya bagi mereka yang bekerja di PTS;
* Salinan ijazah dan transkrip (IPK) S1 dan S2 yang telah dilegalisir
* Surat keterangan/bukti bahwa pelamar adalah dosen tetap;

Berkas dokumen tersebut dikirimkan ke Dikti, dengan alamat:
Direktorat Pendidik & Tenaga Kependidikan
Ditjen Pendidikan Tinggi, Jl. Pintu 1 Senayan, Jl. Jenderal Sudirman,
Jakarta 10002.

Di saat yang bersamaan, kandidat yang mengajukan aplikasi juga harus
berkomunikasi dengan professor calon pembimbing dan pihak universitas
di Belanda agar mereka menyiapkan dokumen-dokumen yang juga menjadi
berkas yang disyaratkan.

Dokumen-dokumen yang harus disiapkan oleh universitas di Belanda dan
dikirimkan ke Neso Indonesia:
* Surat rekomendasi dari Profesor Belanda;
* Unconditional acceptance letter dari universitas Belanda;
* Surat jaminan keuangan yang dikeluarkan secara resmi oleh pihak
manajemen universitas Belanda atas biaya yang harus dikeluarkan di
tahun keempat program doktor yang akan dijalani kandidat;
* Bukti kemampuan bahasa Inggris (IELTS minimal 6.0 atau IBT TOEFL minimal 80);
* Proposal penelitian, termasuk rencana penelitian (maksimum 5 halaman);
* Curriculum Vitae.

Batas waktu terakhir pengiriman berkas lengkap pada 1 Desember 2011.
Bagi calon yang diterima akan diumumkan pada Maret 2012. Persiapan
keberangkatan dilakukan Mei-Juli 2012, sementara pembekalan studi di
luar negeri pada bulan Juni-Juli 2012. Para mahasiswa akan
diberangkatkan pada Juli-Agustus 2012.

Beasiswa S-3 Studi Eropa di Australia

Pusat Studi Eropa di The Australian National University (ANU) membuka
kesempatan beasiswa untuk jenjang S-3. Pembiayaan akan diberikan
selama tiga tahun penuh, dengan jumlah 23.728 dollar Australia per
tahun.

Area penelitian yang bisa dilakukan oleh penerima beasiswa, di antaranya:
- European Integration and Comparative Regionalism
- History, Culture and Society
- Climate Change and Energy
- Defence, Diplomacy and Security
- Migration and Multiculturalism
- Institutions, Governance and Citizenship

Persyaratan yang harus disiapkan di antaranya formulir aplikasi,
proposal riset, dan CV yang harus dikirimkan melalui e-mail:
europe@anu.edu.au.

Apa saja persyaratan lebih spesifik? Silakan akses di situs web
ces.anu.edu.au Informasi lebih jauh bisa menghubungi Prof. Jacqueline
Lo, ANUCES Director melalui e-mail: Jacqueline.Lo@anu.edu.au

Pengajuan aplikasi paling lambat 14 November 2011.

Indonesia Salary Guide Terbaru 2011 / 2012

Click here to download:
indonesia_salary_guide_2011_12.pdf (1.34 MB)
(download)

Terlampir Indonesia Salary Guide Terbaru 2011 / 2012 released by Kelly Services

Flash Drive Unique

For more flash drive visit us at http://segala-flashdisk.blogspot.com

(download)

BURJ KHALIFA - Worlds Tallest Tower


The world's tallest tower, 'Burj Khalifa' is 828 metres (2,716.5 ft) high




Dubai, UAE; January 4, 2010: The world's tallest tower, developed by Emaar Properties, was unveiled tonight to a crowd of thousands and the world in a crescendo of fireworks, lasers and fountain displays.


The official height of the tower, unveiled as 'Burj Khalifa', was announced as 828 metres (2,716.5 ft).


A closely guarded secret, the official height of Burj Khalifa was flashed onto a giant screen before an estimated crowd of more than 400,000, as lasers and fireworks lit up the night sky.


Fireworks cascaded from the tower's spire to the base and lasers blazed out from all levels leaving the crowds awestruck.


The height was disclosed in arithmetic progression, with the numbers being flashed onto the screen, one after another. The tower's height breaks all existing world records for tall buildings.


Burj Khalifa is the tallest building in the world according to the three main criteria of the Council on Tall Buildings and Urban Habitat (CTBUH). The CTBUH ranks the world’s tallest buildings based on ‘Height to Architectural Top,’ ‘Height to Highest Occupied Floor’ and ‘Height to Tip.’


At 828 metres (2,716.5ft), Burj Khalifa is 320 metres taller than Taipei 101, which at 508 metres (1,667 ft) had held the record for the world’s tallest building measured to the architectural top since 2004, the year the project was announced.


Burj Khalifa achieved the distinction of being the world's tallest structure – surpassing the KVLY-TV mast (628.8 metres; 2,063 ft) in North Dakota, USA – 1,325 days after excavation work started in January 2004.


The tower also beats the 31-year-old record of CN Tower, which at 553.33 metres (1,815.5 ft) had been the world’s tallest free-standing structure on land since 1976.


Burj Khalifa employs a record-breaking 330,000 cubic metres of concrete, 39,000 metric tonnes of steel rebar and 142,000 square metres of glass; and it took 22 million man hours to build.


Other world records for Burj Khalifa include the highest occupied floor in the world, at over 550 metres (1,800 ft); the highest outdoor observation deck in the world – At the Top on Level 124; and the tallest service elevator, which travels to a height of 504 metres (1,654 ft).


Mr. Mohamed Alabbar, Chairman, Emaar Properties, said that with the unveiling of the final height of Burj Khalifa, the world now had a new reference point for high-rise developments.


“Burj Khalifa is an example of collaboration on a global scale, and the tremendous positive energy that can be generated when people from all over the world come together to work towards a common goal. Thousands of professionals and skilled workers from around the world worked on this once-in-a-lifetime project.”


“More than 60 of the world’s leading consultants including South Korea’s Samsung Corporation and New York-based Turner Construction International realised the design for Burj Khalifa of Chicago-based Skidmore, Owings and Merrill (SOM),” he said.


Burj Khalifa employed the latest advances in wind engineering, structural engineering, structural systems, construction materials and methods. All design considerations took into account the 12,000 people who will live and work in the tower. The handover to residents of the various components of Burj Khalifa will begin in February.


With a total built-up area of about 6 million sq ft, Burj Khalifa features nearly 2 million sq ft of residential space and over 300,000 sq ft of prime office space, in addition to the area occupied by the keenly awaited Armani Hotel Dubai and the Armani Residences. The tower also features modern lifestyle amenities including clubs, health and fitness facilities, gourmet restaurants and the 124th floor observation deck, 'At the Top.'


Burj Khalifa is the focal point of the 500-acre ‘mega-project’ by Emaar Properties, described as the new heart of Dubai.


 



 



 



 

BURJ DUBAI DETAILS


 

Image removed by sender.

 



 



 



 



 



 



 



 

INAUGURATION PHOTS


 



 



 



 



 



 



 

FIRE WORKS PHOTS


 

Fireworks to mark Burj Dubai inauguration


 

The inauguration of Burj Dubai, the world’s tallest building, developed by Emaar Properties, will feature a spectacular display of sound, light, water and fireworks on the evening of Jan 4.


A combination of dazzling fireworks, light beams, choreographed water displays, and sound & music effects will describe the evolution of the world’s most iconic new building in a breathtaking sensory journey.


In all, 868 high-powered ‘stroboscope’ lights will be integrated into the facade of Burj Dubai and the tower’s spire – and each stroboscope will be fired individually to create a series of hypnotic lighting sequences.


The entire display is controlled by a sophisticated arrangement of ultra high-tech IT systems, which choreograph at least 50 different sequences of lighting, fireworks, water and sound effects.


Event experts from France, Britain and the United States collaborated on the project, demonstrating the global spirit of teamwork which defines Burj Dubai itself.


Powerful strobe lights will be fixed near the pinnacle of the tower, and six ‘narrow beam’ search lights will be positioned 700 metres up the tower..


The entire inauguration show consists of a pre-show and three themed acts – From the Desert Flower to Burj Dubai, Heart Beat, and From Dubai & the UAE to the World - and a firework finale.


A giant screen on Burj Park Island, as well as several television screens placed across Downtown Burj Dubai including the Waterfront Promenade, will broadcast the inauguration in real-time. Hundreds of international media, including Dubai TV, will report live from the scene.


The public can watch at the inauguration ceremony from the Waterfront Promenade adjacent to The Dubai Mall.


The inauguration performance begins with a short film which depicts the story of Dubai and the evolution of Burj Dubai as the world’s tallest building. A precisely choreographed sound, light, water and fireworks display then follows.


The first act in the light & sound show, themed ‘From the Desert Flower to Burj Dubai,’ is a co-ordinated water, light and firework display. Guests can watch the unfolding of the desert lily, Hymenocallis, the design inspiration of Burj Dubai. The segment ends with a rhythmic water and fireworks show.


The second act, ‘Heart Beat,’ captures the construction of the tower in a dynamic light show. An astonishing example of technological innovation, the display recreates the effect of a beating heart and uses no fewer than 300 ‘space canon projectors’ to generate a shadow-like image of the tower.


In the third act, ‘From Dubai and the UAE to the World,’ sky tracers and space canons envelop the tower in a strong halo of white light before reproducing the sun beams of the Emaar corporate logo. These then expand in all directions as the lighting rig on the tower’s spire activates.


In its spectacular finale, the show will feature an impressive show of 10,000 firework effects on and from the tower, envisaged as the highest in the world. The sparkling display will illuminate the entire Downtown Burj Dubai area.


Ahmad Al Matrooshi, Managing Director, UAE, Emaar Properties, said that the performance would be unprecedented and symbolic of Burj Dubai’s pioneering status.


“Just as Burj Dubai leaves an indelible impression on the mind’s eye, so the performance dedicated to the tower’s inauguration on January 4 will be a memory to cherish.”


Standing at more than 800 metres (2,625 ft) high and with over 160 storeys, Burj Dubai is the world’s tallest building developed by Emaar Properties. The tower anchors the 500-acre Downtown Burj Dubai community, described as the new heart of the city
.

 



 



 



 



 



 

 

FROM TO TOP PHOTS


 



 



 



 

 



 



 



 



 



 



 


 

Forex bisa menguntungkan..

Seandainya aku punya modal..USD 10,000.. :(( Lihat hasil di bawah...Profit dlm waktu kurang lebih dari satu minggu...lihat closed trade P/L udah USD 4,000!! Belajar, disiplin dan tidak rakus...

PT Millennium Penata Futures

Account: 9294141 Name: ihsankamil Currency: USD 2010 January 5, 09:17
Closed Transactions:
Ticket Open Time Type Size Item Price S / L T / P Close Time Price Commission Taxes Swap Profit
7516245 2009.12.25 02:27 balance Deposit 10 000.00
7517174 2009.12.28 02:54 buy 1.00 gbpusd 1.5941 0.0000 1.5956 2009.12.28 03:57 1.5956 -50.00 0.00 0.00 150.00
7517713 2009.12.28 03:59 sell 1.00 eurusd 1.4385 0.0000 1.4370 2009.12.28 05:52 1.4398 -50.00 0.00 0.00 -130.00
7517789 2009.12.28 04:05 buy 1.00 usdchf 1.0353 0.0000 1.0370 2009.12.28 09:30 1.0370 -50.00 0.00 0.00 163.93
7519505 2009.12.28 06:19 buy 1.00 eurusd 1.4386 0.0000 1.4396 2009.12.28 08:05 1.4387 -50.00 0.00 0.00 10.00
7520350 2009.12.28 08:11 sell 1.00 eurusd 1.4388 0.0000 1.4370 2009.12.28 12:30 1.4401 -50.00 0.00 0.00 -130.00
7522241 2009.12.28 11:00 buy 1.00 usdchf 1.0356 0.0000 1.0369 2009.12.28 17:12 1.0335 -50.00 0.00 0.00 -203.19
7522269 2009.12.28 11:04 sell 1.00 gbpusd 1.5975 0.0000 1.5960 2009.12.28 17:12 1.6002 -50.00 0.00 0.00 -270.00
7524003 2009.12.28 17:12 sell 1.00 gbpusd 1.5995 0.0000 1.5980 2009.12.29 07:26 1.6006 -50.00 0.00 -17.50 -110.00
7524825 2009.12.29 02:43 buy 1.00 usdjpy 91.79 0.00 0.00 2009.12.29 13:29 91.74 -50.00 0.00 0.00 -54.50
7528939 2009.12.29 10:05 buy 1.00 usdchf 1.0316 0.0000 1.0330 2009.12.29 18:01 1.0330 -50.00 0.00 0.00 135.53
7529216 2009.12.29 10:21 sell 2.00 gbpusd 1.6046 0.0000 0.0000 2009.12.29 10:28 1.6064 -100.00 0.00 0.00 -360.00
7530494 2009.12.29 12:55 sell 2.00 eurusd 1.4414 0.0000 1.4400 2009.12.29 18:02 1.4400 -100.00 0.00 0.00 280.00
7530589 2009.12.29 13:16 buy 2.00 gbpusd 1.5986 0.0000 1.6004 2009.12.29 13:27 1.5995 -100.00 0.00 0.00 180.00
7530651 2009.12.29 13:28 sell 2.00 gbpusd 1.5997 0.0000 1.5940 2009.12.29 18:02 1.5968 -100.00 0.00 0.00 580.00
7532452 2009.12.29 18:33 sell 2.00 usdchf 1.0375 0.0000 1.0320 2009.12.29 19:10 1.0363 -100.00 0.00 0.00 231.59
7532476 2009.12.29 18:38 buy 2.00 gbpusd 1.5885 0.0000 1.5955 2009.12.29 19:25 1.5930 -100.00 0.00 0.00 900.00
7532603 2009.12.29 19:29 buy 2.00 usdchf 1.0369 0.0000 1.0382 2009.12.30 01:59 1.0376 -100.00 0.00 -28.92 134.93
7532608 2009.12.29 19:30 sell 2.00 gbpusd 1.5914 0.0000 1.5895 2009.12.29 23:30 1.5895 -100.00 0.00 0.00 380.00
7532895 2009.12.30 01:40 buy 2.00 gbpusd 1.5916 0.0000 1.5945 2009.12.30 17:15 1.5945 -100.00 0.00 0.00 580.00
7532933 2009.12.30 02:02 buy 2.00 gbpusd 1.5904 0.0000 1.5935 2009.12.30 17:15 1.5935 -100.00 0.00 0.00 620.00
7540814 2009.12.31 03:36 sell 2.00 eurusd 1.4357 0.0000 1.4344 2010.01.04 00:00 1.4344 -100.00 0.00 -32.02 260.00
7543872 2009.12.31 12:29 buy 2.00 usdchf 1.0304 0.0000 1.0330 2010.01.04 00:02 1.0330 -100.00 0.00 -58.20 503.39
7545605 2010.01.04 03:39 buy 2.00 eurusd 1.4271 0.0000 1.4295 2010.01.04 04:29 1.4279 -100.00 0.00 0.00 160.00
7548056 2010.01.04 06:13 buy 2.00 eurusd 1.4292 0.0000 1.4305 2010.01.04 07:47 1.4305 -100.00 0.00 0.00 260.00
7549161 2010.01.04 08:25 buy 2.00 eurusd 1.4295 0.0000 1.4306 2010.01.04 09:52 1.4306 -100.00 0.00 0.00 220.00
7552834 2010.01.04 11:47 sell 2.00 gbpusd 1.6185 0.0000 1.6170 2010.01.04 14:19 1.6170 -100.00 0.00 0.00 300.00
7552941 2010.01.04 11:55 sell 2.00 gbpusd 1.6197 0.0000 1.6185 2010.01.04 12:50 1.6185 -100.00 0.00 0.00 240.00
7553926 2010.01.04 13:52 sell 2.00 gbpusd 1.6220 0.0000 1.6190 2010.01.04 14:10 1.6190 -100.00 0.00 0.00 600.00
7555336 2010.01.04 17:57 buy 2.00 usdchf 1.0286 0.0000 1.0304 2010.01.05 02:49 1.0293 -100.00 0.00 -29.13 136.01
7555368 2010.01.04 18:07 sell 2.00 eurusd 1.4432 0.0000 1.4410 2010.01.04 23:52 1.4410 -100.00 0.00 0.00 440.00
7555992 2010.01.05 02:38 buy 2.00 gbpusd 1.6122 0.0000 1.6135 2010.01.05 08:33 1.6135 -100.00 0.00 0.00 260.00
7556043 2010.01.05 02:55 sell 2.00 usdjpy 92.34 0.00 92.10 2010.01.05 03:31 92.31 -100.00 0.00 0.00 65.00
7556291 2010.01.05 03:25 buy 2.00 gbpusd 1.6079 0.0000 1.6122 2010.01.05 05:14 1.6095 -100.00 0.00 0.00 320.00
7560070 2010.01.05 08:34 sell 2.00 gbpusd 1.6137 0.0000 1.6125 2010.01.05 09:12 1.6125 -100.00 0.00 0.00 240.00
  -2 900.00 0.00 -165.77 7 092.69
Closed P/L: 4 026.92
Open Trades:
Ticket Open Time Type Size Item Price S / L T / P   Price Commission Taxes Swap Profit
7559136 2010.01.05 07:05 buy 2.00 usdchf 1.0293 0.0000 1.0309   1.0274 -100.00 0.00 0.00 -369.87
7559291 2010.01.05 07:29 buy 2.00 usdjpy 91.87 0.00 92.02   91.76 -100.00 0.00 0.00 -239.76
  -200.00 0.00 0.00 -609.63
  Floating P/L: -809.63
Working Orders:
Ticket Open Time Type Size Item Price S / L T / P Market Price  
No transactions
 
Summary:
Deposit/Withdrawal: 10 000.00 Credit Facility: 0.00  
Closed Trade P/L: 4 026.92 Floating P/L: -809.63 Margin: 4 000.00
Balance: 14 026.92 Equity: 13 217.29 Free Margin: 9 217.29
17
To Posterous, Love Metalab